Relocation of Biology Buildings B, C, and D to the Ecology Building
This webpage has been created to provide an overview of the relocation to the Ecology Building. You will find information about schedules, workflows, and contact persons here. The page will be updated continuously.
Institutional densification 2025–2026
The institutional densification project aims to consolidate activities so that Sensory Biology and Biodiversity and Evolution will operate on the third floor of the Ecology Building, while Evolutionary Ecology and Infection Biology and Functional Ecology will have laboratories and offices on the second floor. Molecular Biosciences will remain in Biology Building A, while the only activity that will continue in Biology Building B is the microscopy platform.
Biology Building
The institution will vacate Biology Buildings C and D before 2025 and Building B before 2026. Laboratories will be established directly in the Ecology Building, while offices will temporarily remain in Building B during 2025. For undergraduate education, the primary focus is lab room with an associated storage area. This requires adequate ventilation, a flexible entryway for appropriate clothing changes and handwashing, and ensured security in the facility.
As the student lunchroom in Building B will be removed, pressure on the corresponding lunchroom in Building A will increase. The plan is to convert the currently underutilised computer room on the second floor, next to the lecture hall, into a bookable seminar room that can also function as an additional lunchroom (but not a kitchen).
Ecology Building
Relocations within the Ecology Building are ongoing to physically consolidate the divisions. The plan is for CEC to vacate its spaces during September 2025, after which the relocation from Biology Building B to the Ecology Building can begin. During the spring of 2025, a P2 laboratory will be built on the second floor of the Ecology Building, and the undergraduate education will remodel parts of the first-floor corridor, currently housing Functional Ecology, into two new classrooms and one new laboratory.
By 2026, the undergraduate education will need more group rooms, as several will be lost due to the vacation of Building B.
Vision
The goal is to create functional and well-utilised spaces where divisions are gathered in shared or individual offices, with common lunchrooms and functional laboratories open to all researchers, fostering a collaborative environment for research and education. The vision is not set in stone and may be adjusted over time.
- Vision for Floor 1, Ecology Building (new tab; pdf; 755 kB)
- Vision for Floor 2, Ecology Building (new tab; pdf; 799 kB)
- Vision for Floor 3, Ecology Building (new tab; pdf; 1 MB)
General timeline
Autumn semester 2025
- Ongoing – disposal of equipment from the soil analysis lab on floor 3
- Ongoing – relocation of lab on floor 3 to be converted into histology lab, chemical and lab storage
- Ongoing – clearing out the chemical storeroom on floor 3
- Ongoing – renovation and reconstruction of labs in the Ecology Building
- Start of construction for the cold room “Isbjörnen” in the basement of the Ecology Building
- Completion of “Isbjörnen” and move-in of freezers
- Work on the new dishwashing room will begin in September
- Carrying out the room-function programme for undergraduate teaching spaces in the D corridor on the 1 floor of the Ecology Building
- Relocation of the sterile/cell lab on floor 3
- Conversion of lab from extraction lab to pcr lab on floor 3
- Restructuring of cold room on floor 3 to make space for Sensory Biology
- Packing up and moving the Sensory Biology labs
- Moving of the lunch-room storage on floor 3
- Move of the pcr lab on floor 3 to be completed
- Move of the gel room and the server on floor 3
- Move of the fly group on floor 3
- Commencement of construction of a p2 lab
October – December 2024
- Group rooms on the ground floor were converted into offices for staff from Biology Building C. HR and financial administrators have relocated from Biology Building B to free up additional office spaces.
- All offices have been moved from Biology Building C to B.
- Review of chemicals
- Inventory of refrigerators and freezers in Biology Buildings B and C
Spring 2025
Identified potential replacement labs in the Ecology Building for those currently in Biology Building C. Some spaces are still to be found.
- Relocation of instrumental chemistry on the third floor
- Discussions about lab renovations to ensure they function as replacements for the labs being phased out (Sensory Biology)
- Awaiting the start of planning for the P2 lab
- Awaiting the start of planning for the construction of the cold storage room "Isbjörnen" in the basement of the Ecology Building
- Establishment of a room function program for undergraduate facilities in the D-corridor on the first floor of the Ecology Building
- Discussions about the allocation of storage spaces in the basement of the Ecology Building
- The planning of the P2 lab and the relocation of the Functional Ecology dishwashing room are to be completed in June
Risk and impact analyses
We have conducted a comprehensive risk and impact analysis for the entire relocation process. New analyses are carried out continuously for major projects or significant changes. If you wish to access any of the risk and impact analyses, please contact one of the following persons:
Administrative Manager: Joakim Nilsson (Joakim [dot] Nilsson [at] biol [dot] lu [dot] se)
Facility Manager: Henrik Wendel (Henrik [dot] Wendel [at] biol [dot] lu [dot] se)
Chief Safety Representative: Carina Rasmussen (Carina [dot] Rasmussen [at] biol [dot] lu [dot] se)
Contact
People responsible for the relocation process
Ecology Building
Floor 2 – Staffan Bensch (contact info on the Staff Pages)
Floor 3 – Magne Friberg (contact info on the Staff Pages)
Biology Building
Biology Building B – Eric Warrant (contact info on the Staff Pages)